Pick the system at Stage 1
The stages only build on each other if the first battery and inverter belong to one maker’s system that supports every later step. Mixing makers is where upgrades turn into tear-outs. Before Stage 1, confirm in the manufacturers’ own installation documents that the chosen equipment can:
- run with the grid down and keep the microinverters producing (an AC-coupled, multimode system with its own controller). Watch the difference between riding through a utility outage and running permanently with no utility at all: Enphase’s IQ8, IQ Battery 5P and IQ System Controller 3G do the first, but Enphase’s supported permanent off-grid design also requires a standby generator, a generator connection and its own commissioning and design review;
- throttle solar when the battery is full and the loads are light;
- black-start after the battery runs low;
- accept the vehicle the owner plans to buy. GM says its V2H equipment doesn’t work with other makers’ batteries, and Tesla’s Model 3/Y home backup requires a Powerwall 3;
- interconnect later under the utility’s rules.
If any answer is no or unknown, plan for that part to be replaced at the later stage and say so in the quote.
Stage 1: Stand alone
The roof and a battery run the structure’s own loads: pump, salt chlorine generator, lights, fans, fridge, outlets. No connection to the house or the utility, so no interconnection approval. Building and electrical permits still apply. Code: NEC Article 710 (stand-alone systems) along with 690 and 706. The inverter, battery, solar and any generator or controls the maker requires must form a complete, maker-supported stand-alone system. If the owner wants it generator-free, find equipment the maker supports that way, and check that it also supports the later stages.
Stage 2: Back up the house
A feeder from the battery to a transfer switch or backup panel at the house. When the grid drops, the switch isolates the house from the utility and the battery carries the chosen circuits. In a supported multimode system, the battery inverter forms the AC the microinverters need, so solar keeps refilling the battery during the outage. Test that in commissioning with the grid actually off.
- If the transfer switch switches the neutral, the battery system is a separately derived system: system bonding jumper at the source or first disconnect, and a grounding electrode conductor to the electrode system, per NEC 250.30(A). If the switch doesn’t switch the neutral, don’t bond neutral to ground at the battery.
- Draw every neutral and bond: utility neutral, backup-source neutral, switched or solid neutral, where the system bonding jumper sits, the grounding electrode conductor and the equipment grounds. A battery inverter, a vehicle kit and a transfer switch can each handle the neutral differently.
- A system that never runs in parallel with the grid usually needs no net-metering rider. A system that stays grid-connected but is set to export nothing can still need an interconnection review. Ask the utility which one they consider it.
- Test rapid shutdown in backup mode too: with the battery holding up the backup bus, opening the utility disconnect doesn’t de-energize the roof.
- Size the backup loads to the inverter’s continuous and surge ratings; well pumps need a starting-surge check.
Stage 3: Add the vehicle
A charger on the post charges the vehicle from the roof. Sending power back to the house takes a transfer arrangement approved for that vehicle: the maker’s own kit, or a third-party system the maker expressly supports, like Ford’s GenerLink option. Never a generic interlock, cord or transfer switch without documented suitability.
| Vehicle | Home backup equipment | Output |
|---|---|---|
| GM EVs (Silverado EV, Sierra EV, Hummer EV, Equinox EV and others) | GM Energy V2H Bundle: the PowerShift bidirectional charger plus the V2H Enablement Kit (Home Hub, inverter and a dark-start battery that boots the system in an outage). List price $8,998. Check GM’s list of V2H-capable models, years and trims. GM says this equipment doesn’t work with other makers’ battery systems. | Up to 9.6 kW |
| Tesla Cybertruck | Two separate setups. Without a Powerwall: Universal Wall Connector, Powershare Gateway and, where needed, a Backup Switch. With a Powerwall 3: the Powerwall and a Gen 3 or Universal Wall Connector. Never put a Powershare Gateway into a Powerwall system. The truck’s 9.6 kW bed outlets are a different thing. | Up to 11.5 kW |
| Tesla Model 3 / Model Y | Powerwall 3 and a Gen 3 or Universal Wall Connector (no Gateway option). Only cars with the hardware: U.S. orders from Oct 1, 2026 and some earlier builds; check the car shows “Powershare Support: Enabled” (software 2026.32.6 or later). Tesla’s current eligibility instructions offer no retrofit; check the individual car before you quote. Powerwall 2 and Powerwall+ support is listed as coming later. | Up to 11.5 kW |
| Ford F-150 PowerBoost and Lightning | GenerLink transfer switch at the meter (or beside it where the utility allows other switch types), a GenerLok cord and Ford’s 12-inch vehicle connector to the 240-volt Pro Power Onboard outlet. Fits 2021–2026 PowerBoost (7.2 kW) and 2022–2025 Lightning (9.6 kW). About $1,100 for the bundle; installation about $250–$450 at the meter or $1,000–$1,500 beside it. How the GenerLink hookup works. The utility must approve it and decides who installs. The PowerBoost runs its gas engine to keep up: outdoors only, never in a garage or under an enclosed roof. | 7.2 kW for either truck through this hookup: one 240-volt, 30-amp outlet. The Lightning’s 9.6 kW is the total across all its outlets. |
These are separate systems, not plug-in Stage 3 modules. Each may bring its own transfer equipment and energy management, and its fit with the Stage 1 battery and solar has to be documented for the exact combination. Status as each maker has announced it. Full vehicle list.
Stage 4: Tie to the grid
With the utility’s approval, the system interconnects to the house and starts lowering the bill. In an outage the battery inverter disconnects from the grid and keeps the backup loads running. Plain grid-tied solar without that kind of battery shuts off.
- Interconnection: NEC 705 and the utility’s application.
- Rapid shutdown: microinverters cover the function at the panel; the 690.56(C) labels still apply.
Bugging Out Solar provides the structure and the stamped structural drawings. Wire sizes, breakers, branch circuits, the point of connection and all electrical work are designed and installed by a licensed electrician under a local permit. Code notes here are pointers to check, not legal or engineering advice; your inspector has the final say.