Bugging Out Solar
Home / Pros
For electricians and builders

The pro hub

The research behind a solar carport or pool house job in North Carolina: code editions, battery rules, utility rules, vehicle hookups and the inspection list, with sources. A starting point for your own design and permit set. Print any page and take it to the site.

How a job works

  1. The homeowner picks a structure and buys the kit or the stamped plans.
  2. A North Carolina Professional Engineer seals the structural set for the site. The electrical design is yours.
  3. The timber shop cuts and drills every piece, including the wire chase in the post, the hole through the plate and the conduit stub location in the footing.
  4. The builder raises the frame. You set the microinverters, run the trunk, make the point of connection and pull the electrical permit.

What the frame already does for you

  • A routed wire chase in one post, with a flush wood cover strip. Lights, fans and outlets get a second chase in another post.
  • A 1-1/4" hole down through the plate into the chase, drilled at the shop.
  • A Schedule 80 PVC sweep and stub cast in that post’s footing, so the underground run starts where the wire comes out.
  • A flat run along the ridge top and the plate top for the AC trunk cable, hidden under the panels.

Bugging Out Solar provides the structure and the stamped structural drawings. Wire sizes, breakers, branch circuits, the point of connection and all electrical work are designed and installed by a licensed electrician under a local permit. Code notes here are pointers to check, not legal or engineering advice; your inspector has the final say.

← Back to the pro hub   Print this page