The pro hub
The research behind a solar carport or pool house job in North Carolina: code editions, battery rules, utility rules, vehicle hookups and the inspection list, with sources. A starting point for your own design and permit set. Print any page and take it to the site.
Carport spec sheet
Sizes, posts, roof, panel layout and the conduit route built into the timbers. Open →
One-line diagrams
Four stages, from stand-alone to grid-tied, with the vehicle hookups by brand. Open →
The field guide
NC code editions, battery location limits, Duke Energy rules, output by month, voltage rise, pool rules, inspection and commissioning checklists. Open →
Which code applies in NC
2017 NEC on houses, 2020 on everything else, 2023 on hold, and what that changes for solar, batteries and EVs. Open →
Pool house electrical rules
NEC 680 distances for bonding, lights, fans, outlets and disconnects. Open →
Duke PowerPair rebate math
Paid on AC watts, not panel watts. Worked examples and availability. Open →
Become an installer partner
Get homeowners in your area who have already picked a structure. Open →
How a job works
- The homeowner picks a structure and buys the kit or the stamped plans.
- A North Carolina Professional Engineer seals the structural set for the site. The electrical design is yours.
- The timber shop cuts and drills every piece, including the wire chase in the post, the hole through the plate and the conduit stub location in the footing.
- The builder raises the frame. You set the microinverters, run the trunk, make the point of connection and pull the electrical permit.
What the frame already does for you
- A routed wire chase in one post, with a flush wood cover strip. Lights, fans and outlets get a second chase in another post.
- A 1-1/4" hole down through the plate into the chase, drilled at the shop.
- A Schedule 80 PVC sweep and stub cast in that post’s footing, so the underground run starts where the wire comes out.
- A flat run along the ridge top and the plate top for the AC trunk cable, hidden under the panels.
Bugging Out Solar provides the structure and the stamped structural drawings. Wire sizes, breakers, branch circuits, the point of connection and all electrical work are designed and installed by a licensed electrician under a local permit. Code notes here are pointers to check, not legal or engineering advice; your inspector has the final say.