The field guide
Everything we’ve dug up on wiring a solar carport or pool house in North Carolina: which code applies, where the battery can go, what the utility wants, what the roof really makes, and what the inspector checks. Sources at the bottom. Checked November 14, 2026; products and tariffs change fast.
Which code applies in North Carolina
The full code-edition page, with section numbers →
| Electrical, one- and two-family dwellings | 2017 NEC with NC amendments (the 2017 State Electrical Code). A carport or pool house serving a house falls here. |
| Electrical, everything else | 2020 NEC with NC amendments, in force since November 1, 2021. |
| 2023 NEC | Adopted by the state but on indefinite delay. Some jurisdictions, Cary among them, accept it now as an alternate when the plan set says so. Ask before you design to it. |
| Residential building code | 2018 NC Residential Code (based on the 2015 IRC). The 2024 NC Residential Code (based on the 2021 IRC) is delayed: first pushed back by Session Law 2024-57, it now takes effect 12 months after the first day of the month following the State Fire Marshal’s certification of conditions set in Session Law 2025-2, so there’s no fixed date yet. An owner can ask to use it now as an alternate method; the jurisdiction decides. |
What the edition changes for these jobs: under the 2017 NEC, the energy storage disconnect is 706.7 (renumbered 706.15 in 2020), and there’s no outside emergency-shutdown requirement for dwelling batteries. That, and the outdoor emergency disconnect at the service (230.85), arrived in 2020 and don’t apply to a house job under the 2017 code. Article 625 in 2017 already requires EV equipment that can send power back to be listed and marked for it (625.48); later editions expand that rule.
Where the battery can go
The 2018 NC Residential Code has no battery section, so today the rules are NEC 706, the battery’s listing and the maker’s instructions. The delayed 2024 NC Residential Code adds Section R328. Its published rules are a good planning target, but the permit is judged under the code in force when it’s submitted:
- Listed and labeled to UL 9540, with exceptions in the section for some systems listed and marked for use in residential dwelling units and for systems under 1 kWh. Read the full section against the product’s listing.
- No more than 20 kWh per unit, with 3 feet between units unless the maker’s UL 9540A test data allows closer.
- Up to 80 kWh total in a garage, a detached accessory structure, on an outside wall or outdoors on the ground. Up to 40 kWh total in a utility closet, basement or storage room. Other indoor spaces are restricted, with exceptions tied to the product’s listing.
- UL 9540A test data can justify closer spacing. It doesn’t raise the 20, 40 or 80 kWh limits; North Carolina deleted the model code’s path to larger totals.
- The section also covers smoke and heat detection, vehicle-impact protection, ventilation for some battery types, temporary vehicle-to-home power (R328.10, which points to the vehicle maker’s instructions and the electrical code) and owner documentation (R328.11).
A carport or pool house is a detached accessory structure, which is the friendliest location in the code. Protect a battery in a carport from vehicle impact and check its temperature limits; a battery in full sun on the Outer Banks or in a Charlotte August needs shade and airflow.
Utilities
Duke Energy (Charlotte, Lake Norman, most of the Piedmont)
- Residential systems up to 20 kW AC can interconnect under the state’s procedures. Submit the interconnection request and get approval before the system runs in parallel with the grid.
- New net-metering customers go on Residential Solar Choice (since October 1, 2023): a time-of-use rate with critical peak pricing, a minimum monthly bill, and a grid access fee only above 15 kW AC. Exports are credited monthly at Duke’s avoided-cost rate. A limited number of customers each year can take the Net Metering Bridge rider, without the time-of-use requirement, for up to 15 years.
- That rate design rewards shifting midday solar into the evening peak with a battery. Whether the battery pays for itself depends on the time-of-use prices, peak events, battery losses and installed cost; run the numbers on the actual tariff.
- Duke’s PowerPair incentive pays up to $9,000 for new solar plus a new battery: $0.36 per watt of AC solar capacity up to 10 kW AC ($3,600), and $400 per kWh of battery up to 13.5 kWh ($5,400), installed by a Duke Trade Ally. It counts AC watts, not panel watts: thirteen IQ8HC microinverters are about 4.94 kW AC, so this carport’s solar share is about $1,780, not $3,600. As of November 2, 2026, Duke Energy Progress had stopped taking applications (since November 2025) and Duke Energy Carolinas had a small amount of capacity left. Check before you count it. Rebate math →
- PowerPair’s options and Duke’s battery-control programs can let the utility dispatch the battery in exchange for bill credits. Settle the owner’s backup reserve and any control program before promising outage hours.
- Know which Duke company serves the address, Duke Energy Carolinas or Duke Energy Progress. Tariffs, rider availability and applications differ.
- Residential Solar Choice also carries non-bypassable storm-recovery and cybersecurity charges. Legacy net-metering customers move to the Bridge rider after December 31, 2026.
- Approvals by setup: never connected to the utility, none; a backup transfer that never parallels the grid, usually none beyond permits; grid-connected but set to export nothing, may still need an interconnection review; exporting, interconnection and a net-metering rider; anything on the meter, like GenerLink, the utility’s permission.
Dominion Energy, co-ops and town utilities
Dominion serves northeastern North Carolina, including much of the Outer Banks. Electric co-ops (EnergyUnited near Lake Norman, for one) and town utilities write their own interconnection and meter rules. Get their application and meter-collar policy in hand before you price Stage 3 or 4.
What the carport roof makes, month by month
A benchmark, not a forecast for specific equipment. NREL PVWatts version 8, kilowatt-hours a day for 13 panels at 580 W (7.54 kW DC), modeled as 3.77 kW on each slope of the 5 in 12 gable (22.6° tilt); the built roof is 7 panels on one slope and 6 on the other. Premium module setting, 14% system losses, PVWatts’ default 1.2 DC-to-AC ratio and 96% inverter efficiency, no bifacial credit, NREL typical-year weather for each spot (the Outer Banks row too). Model the chosen modules and inverters before you quote production.
| Month | Charlotte, ridge east–west (slopes face south and north) | Charlotte, ridge north–south (slopes face east and west) |
|---|---|---|
| Jan | 15.3 | 15.9 |
| Feb | 18.1 | 18.9 |
| Mar | 24.3 | 24.9 |
| Apr | 29.5 | 29.8 |
| May | 33.2 | 33.4 |
| Jun | 34.7 | 34.7 |
| Jul | 33.1 | 33.2 |
| Aug | 28.7 | 29.0 |
| Sep | 26.1 | 26.5 |
| Oct | 21.2 | 22.1 |
| Nov | 16.2 | 17.1 |
| Dec | 13.1 | 13.5 |
| Year | About 24.5 a day, 8,940 a year | About 25 a day, 9,100 a year |
| Outer Banks (Kill Devil Hills), year | About 25 a day, 9,150 a year | About 25.5 a day, 9,300 a year |
- Ridge direction moves the year by about 2% on a 5 in 12 roof. Set it for the driveway and the view.
- Microinverter clipping. Thirteen IQ8HC microinverters put out about 380 VA each, 4.94 kW AC, a DC-to-AC ratio of about 1.5, well above PVWatts’ default. Our preliminary hourly model (pvlib on PVGIS typical-year weather, 13 panels split 7 and 6) shows about 1 to 2% lost to clipping with IQ8HC and about 4 to 6% with the smaller IQ8MC. It hasn’t been checked against field data, and hourly models tend to understate clipping, so expect the real loss to run somewhat higher.
- Module match. 580 W is above the module range Enphase usually pairs with the IQ8HC. That isn’t an automatic no: compatibility turns on the module’s open-circuit voltage (temperature-corrected), short-circuit current and operating voltage and current against the microinverter’s published limits. Check it in Enphase’s compatibility tool and record the approved pairing in the equipment schedule.
- Battery-backed systems also throttle solar when the battery is full, so energy actually delivered can run below these grid-tied numbers.
- Bifacial gain depends on what’s under the roof and how high the panels sit. Model it separately; don’t add a flat percentage.
- Averages aren’t outages. A December average of 13 kWh a day means nothing on the third gray day of a winter storm. Size the battery for the days with little or no sun.
Branch circuits and voltage rise
- Branch circuits. Enphase allows up to 12 IQ8MC, 11 IQ8AC, 10 IQ8HC or 10 IQ8X on a 20-amp, 240-volt branch circuit. Thirteen panels means two branch circuits, landing in a combiner at the post. Those are maximums; voltage rise or the module can still force a different layout.
- Voltage rise. Enphase recommends keeping total rise below 2% from the farthest microinverter to the point of common coupling, including less than 1 percentage point of rise in the trunk (Q) cable. That’s the manufacturer’s design figure, not an NEC limit, and on a long trench back to the house it usually sets the wire size before ampacity does. Feeding each branch from its middle instead of its end roughly halves the trunk-cable rise.
Voltage rise calculator
Two-wire formula: 2 × one-way length × resistance per foot × amps, for a single-phase two-conductor run with equal conductor lengths. Resistances are uncoated conductors at 75°C from NEC Chapter 9, Table 8. Check ampacity, temperature correction, terminal ratings and conduit fill separately.
Backup load worksheet
Four everyday loads are ticked to start. Tick what the owner wants running in an outage. Typical numbers; use the nameplate or a clamp meter on the real equipment. Hours are run time a day; the fridge and freezer hours stand in for their compressor cycling.
| Load | Running watts | Starting watts | Hours a day |
|---|---|---|---|
| 150 | 1,200 | 8 | |
| 100 | 800 | 8 | |
| 1,000 | 3,000 | 1.5 | |
| 800 | 2,200 | 0.5 | |
| 600 | 1,200 | 6 | |
| 900 | 1,200 | 8 | |
| 200 | 200 | 6 | |
| 60 | 60 | 24 | |
| 200 | 200 | 5 | |
| 1,200 | 1,200 | 0.25 | |
| 500 | 500 | 8 | |
| 500 | 1,000 | 0.1 |
Battery days assume 90% of the battery is usable and 90% makes it through the inverter. Size the inverter for the running total plus the largest single starting surge, with margin. A soft starter matched to the pump can cut its starting surge a lot; confirm the figure for that pump and motor. This is a screening tool: final inverter sizing also weighs simultaneous starts, 120-volt leg balance and the inverter’s surge duration.
Pool houses: NEC Article 680
A pool house isn’t a carport with different loads. Show the pool edge and the distances to the structure on the site plan, and work through Article 680:
- Equipotential bonding (680.26). The perimeter bonding extends at least 3 feet out from the inside walls of the pool. Fixed metal parts must be bonded unless they’re more than 5 feet horizontally from the inside walls (or more than 12 feet above the water, or behind a permanent barrier). Steel connectors, brackets and solar racking on the frame within 5 feet horizontally generally get bonded unless one of those exceptions applies. The PV equipment ground doesn’t replace the pool bonding grid, and the bonding grid doesn’t replace the equipment ground.
- Overhead conductor clearances over the pool (680.9) and underground wiring near it (680.11).
- Receptacles (680.22): pump-motor receptacles at least 6 feet from the inside walls; every 15- or 20-amp, 125-volt receptacle within 20 feet GFCI protected; and at least one GFCI receptacle between 6 and 20 feet from the water. A charger receptacle in the pool house falls under the same distances.
- Lights and ceiling fans (680.22(B)): over the pool or within 5 feet horizontally of the inside walls, new outdoor lights, lighting outlets and ceiling fans generally need 12 feet of clearance above the maximum water level, with specific exceptions and GFCI rules for the 5-to-10-foot zone. On a low pavilion this can move the design.
- Pool equipment disconnect (680.13): readily accessible, within sight of the equipment and generally at least 5 feet from the inside walls. Place it on the site plan before the posts and equipment wall are final.
- Pool pump motors (680.21(C)): GFCI protection on single-phase 120- to 240-volt pump-motor outlets, hardwired or plugged in.
- Corrosion: pool chemicals and salt air eat cheap enclosures and fasteners. Spec stainless or coated hardware and sealed, gasketed boxes, and check 680.12 and 680.14 for equipment rooms and wiring methods in corrosive areas.
Commissioning and handoff
- Inspection signed off, and the utility’s permission to operate in hand before anything runs in parallel with the grid.
- Rapid shutdown tested on grid and on battery backup.
- Grounding and bonding checked for each source and operating mode: the service bond, the system bonding jumper for a separately derived backup source if there is one, the electrode connections and equipment grounds, and no unintended parallel neutral paths.
- Voltage rise: calculate the worst case from the farthest microinverter, then record AC voltage and current at accessible test points during strong production and compare. Note whether it was on grid or backup. Never open energized microinverter connectors to measure.
- Grid-loss test, following the maker’s commissioning procedure: open the approved utility-isolation or test disconnect (never utility-owned equipment) and confirm the backup bus comes up, the well pump and other motors start, the solar keeps charging and throttles back when the battery is full.
- Black start: confirm the maker’s restart after a low-battery shutdown, whether by sunlight, a generator or a reserve.
- Return to grid: transfer back, reconnect delay, loads restored, and the owner’s reserve and charging settings put back.
- Vehicle hookup run through the maker’s own test or app procedure.
- Placards at the service and the carport showing every power source and disconnect.
- The owner shown how to shut it all down, with the manuals left on site.
First visit: site survey
- Utility and rate. It decides Stage 4 and the vehicle hookups.
- Service size, panel brand, busbar rating, open spaces, and whether the main can be downsized. You’ll need these to pick a 705.12 connection method if it ever ties to the grid: the 120% busbar method (2017: 705.12(B)(2)(3)(b), breaker at the opposite end from the main), a supply-side connection, or another method the section allows.
- Meter location and type, for a meter-collar switch.
- Trench path and length from the post with the conduit stub to the house. Mark the septic tank and drain field, irrigation, gas and water lines, and any driveway crossing. Call 811 before digging.
- Circuits the owner wants on backup. Run the load worksheet with them.
- Well pump horsepower, voltage and whether it has a soft start.
- Battery location, against the limits above.
- The owner’s vehicle and model year. Only some can send power back. See the vehicle table.
- HOA rules on detached structures and visible equipment.
The permit packet
From us: the stamped structural set for the site, the frame drawings showing the wire chase, the hole through the plate and the conduit stub in the footing, and the panel layout.
From you, depending on the county: the electrical permit application; a one-line for the stage being built (ours are a starting point); a site plan with the trench route, burial depth and disconnect locations; spec sheets for panels, microinverters, clamps, battery, transfer equipment and charger; a load calculation where the service or a feeder changes; and for a grid tie, the utility’s interconnection approval.
What inspectors look for
- Rapid shutdown tested in both grid and backup modes, with the initiation device where the drawings show it.
- Labels: rapid shutdown (690.56(C)), the PV and AC disconnects, the directory or plaque at the service showing every power source (705.10), and the battery and backup panel markings.
- Working space (110.26): for typical 120/240-volt residential gear, 36 inches deep, 30 inches wide or the width of the equipment if wider, 6-1/2 feet high. Deeper where the voltage or the surface opposite calls for it.
- Burial depth (Table 300.5, the “all locations not specified” row unless noted): PVC conduit 18 inches; direct-burial cable 24 inches; rigid metal conduit 6 inches; a residential 120-volt branch circuit of 20 amps or less with GFCI protection 12 inches; under a one- or two-family driveway, 18 inches for most wiring methods (12 inches for that GFCI branch circuit). Check the table’s other rows for concrete cover, roads and pools.
- GFCI on carport and outdoor receptacles (210.8) and EV charging receptacles (625). The 2020 edition widened 210.8 a lot, so check which edition the job is under.
- Grounding: UL 2703 bonding from panel frames and rails, a continuous equipment ground to the disconnect, and a grounding electrode at a detached structure fed by a feeder (250.32). A single rod needs a second one unless it tests at 25 ohms or less (250.53).
- Outdoors: wet-rated conductors, listed fittings, sealed conduit entries, expansion fittings where long PVC runs are exposed to the sun.
- Listings: everything installed per its listing and the maker’s instructions. Keep the manuals on site.
Questions we get
Is the carport a separate structure?
Yes, when it’s detached. A feeder to it follows Article 225 and 250.32: an equipment grounding conductor, a building disconnect and a grounding electrode at the carport, plus an insulated neutral when there are 120-volt loads, never bonded to ground there. A structure fed by a single branch circuit (a multiwire one counts) with an equipment ground is exempt from the electrode under the 250.32(A) exception. A ground rod is never the fault path; the equipment ground is.
Does Stage 1 need the utility?
No. Nothing connects to the house or the grid. It still needs building and electrical permits.
Can we start at Stage 1 and add later?
Yes, if the first equipment is picked for the planned additions and the maker supports them. Pull a conduit big enough for the later feeder on day one so nobody trenches twice. Later stages can still need different inverters, transfer equipment, protection or controls.
Where do the microinverters go?
On top of the ridge beam, under the panels, one per panel. The trunk cable runs along the ridge top and down the end rafter to the post with the wire chase.
Who needs which license?
Electrical work needs a North Carolina electrical contractor license. A general contractor license is required when the total project cost is $40,000 or more.
Sources
- NC Office of State Fire Marshal, State Electrical Code and Interpretations; 2020 NEC amendments 10.1 and 10.2; 2024 State Building Code delay notice.
- Town of Cary, NC Building Codes (code editions in force).
- ICC, 2024 North Carolina Residential Code contents (Section R328); UL Code Authorities summary of 2021 IRC R328 limits.
- NC Public Staff, Net Metering (Duke Energy riders and interconnection).
- NREL PVWatts version 8, Charlotte, NC.
- Enphase IQ8 installation and design manuals (branch-circuit limits, voltage rise).
- Ford, “GenerLink compatible with Pro Power Onboard” (2026).
- NFPA 70, National Electrical Code, 2017 and 2020 editions.
- Tesla Powershare support and Energy Library documents; GM Energy V2H product pages (November 2026).
- Duke Energy PowerPair availability, Southern Energy Management (updated November 2, 2026); Connecticut DAS 2017 NEC pool checklist (680.22, 680.26).
- Enphase off-grid system announcement and coverage (October 2025), Solar Power World.
- Our own hourly clipping check: pvlib with PVGIS typical-year weather, Charlotte and Kill Devil Hills.
Bugging Out Solar provides the structure and the stamped structural drawings. Wire sizes, breakers, branch circuits, the point of connection and all electrical work are designed and installed by a licensed electrician under a local permit. Code notes here are pointers to check, not legal or engineering advice; your inspector has the final say.