The structure
| Footprint | About 20 x 24 feet, two full-size trucks side by side |
| Frame | 8 x 8 posts, 8 x 10 beams, 4 x 6 knee braces, 4 x 8 rafters under every panel seam, black steel plates |
| Footings | Concrete piers; size, depth and reinforcing by the engineer of record |
| Headroom | Set to the owner’s vehicles on the stamped set; measure under the lowest knee brace |
| Roof | Gable, 5 in 12 (about 22.6°). The glass panels are the roof surface, as part of the engineered roof assembly on the stamped set: module model, attachment, seals and drainage, fire classification, wind uplift and how a broken panel gets replaced. A module’s listing alone doesn’t make it a roof. |
| Solar | About 7.5 kW of bifacial glass panels (about 13 at 580 W); exact count on the stamped set |
| Expected output | About 25 kWh a day averaged over the year in Charlotte (NREL PVWatts, both roof slopes): about 13 in December, about 35 in June. Month by month |
The wiring route
- Microinverters, one per panel, on top of the ridge beam. Panel leads plug in right above.
- AC trunk cable along the ridge top to the end, then down the top of the end rafter.
- Along the plate top, under the panels and behind the rafter tails.
- Junction box on the plate top beside the rafter over the chase post. Wet-location listed and gasketed. Out of sight under the panels but reachable by lifting the panel above it, as NEC 314.29 requires; leave the clamp access to do that.
- Down a 1-1/4" hole through the plate into the routed chase in the post. 3/4" liquidtight in the back of the groove; a flush cover strip closes it. No splices or pull points inside the chase. The cover is set back far enough, or the raceway protected, so trim nails and screws can’t reach it (NEC 300.4). The engineer of record approves the plate hole and the routed post.
- Out the bottom of the post into the Schedule 80 PVC sweep and stub cast in the footing, then underground to the house panel or the backup battery.
From the ground you see only the plate, the rafter tails and the fascia. The steel brackets are not the grounding path.
Grounding and bonding
- Panel frames and rails bonded with UL 2703 listed clamps.
- The equipment ground runs with the trunk cable to the AC disconnect.
- If a feeder runs to the carport as a separate structure: two hots and an equipment grounding conductor, plus an insulated neutral when the carport has 120-volt loads. Grounding electrode at the carport, bonded to the disconnect’s equipment ground bar. Neutral never bonded to ground at the carport. Disconnect per NEC 225 and 250.32. A feeder that also serves pool equipment falls under 680.25 too.
Point of connection
Yours to design. The one-line diagrams show the four ways it usually goes: stand-alone, house backup through a transfer switch, adding a two-way vehicle, and tying to the grid.
Code sections to check
- Solar: NEC 690. Listed microinverters meet the 690.12 rapid-shutdown function; still provide the 690.56(C) rapid-shutdown labels at the service equipment and the initiation device.
- Batteries: NEC 706 and the battery’s listing. 2017: the ESS disconnect under 706.7. 2020 (706.15) adds an outdoor disconnect or remote control for one- and two-family dwellings; don’t carry that onto a house job permitted under 2017 unless the inspector asks.
- EV charging: NEC 625 for the charging circuit. Equipment that sends power back must be listed for the vehicle and the way it’s used, in a setup the vehicle maker supports. That can include a third-party transfer system the maker expressly approves, like Ford’s GenerLink option. Check Articles 625, 702 and 705 as they apply.
- Backup and transfer equipment: NEC 702, and NEC 250.30 if the backup source is a separately derived system (neutral switching).
- Stand-alone stage: NEC 710.
- Grid tie: NEC 705 and the utility’s interconnection rules.
- Pool house: NEC 680. See the pool notes.
- Detached structure feeder: NEC 225 and 250.32.
- Underground conduit cover: NEC Table 300.5. Wet-location boxes: NEC 314.15.
Code basis in North Carolina: the state electrical code is the 2020 NEC with NC amendments, but one- and two-family dwellings are excluded from it and stay on the 2017 NEC with NC amendments. The 2023 code is adopted but on indefinite delay. Section numbers here are 2017 NEC unless marked. Confirm the edition with your inspector.
Bugging Out Solar provides the structure and the stamped structural drawings. Wire sizes, breakers, branch circuits, the point of connection and all electrical work are designed and installed by a licensed electrician under a local permit. Code notes here are pointers to check, not legal or engineering advice; your inspector has the final say.